Airlander 10 In Final Stages Of Preparation For First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-Unlimited-05.28.24

Airborne-FlightTraining-05.29.24 Airborne-Unlimited-05.30.24

Airborne-Unlimited-05.24.24

Mon, Mar 28, 2016

Airlander 10 In Final Stages Of Preparation For First Flight

Hybrid Aircraft Nearly Complete After Attachment Of Major Components

The Airlander 10 is almost complete and ready to leave the hangar after a succession of momentous attachments to the hull.

The first of the major attachments to the hull was the lower port fin. The massive 11 x 9 m (36 X 28 foot) fin was lifted onto the hull by a huge crane and then attached by our expert team.

Next it was the turn for one of the four 350 hp, 4 litre V8 direct injection, turbocharged diesel engines to be hoisted up onto the stern of the hull; it was attached to five carbon composite battens that had been secured in readiness.

Even though this was done after quitting time, the company says many of its proud members of staff stayed to watch as history was made.

There was no chance for a rest after the huge engine was fitted as the payload module was delivered and maneuvered under the enormous hull. The payload module, another light but durable carbon composite structure, is the area behind the cockpit where the passengers or cargo will be carried.

Following this the upper starboard fin was affixed using a crane and two cherry pickers.

Earlier in the week, the first LERX (Leading-edge root extension) being affixed to the port fin and on March 9, the other upper fin was affixed to the hull, as well as the second pylon; the pylon is on the side of the hull at the front of the Airlander and will house one of the vectored engines, which will rotate during take-off and landing.

By the end of this month, the company says the final attachments will have been made and the payload module completed.

(Images provided with Hybrid Air Vehicles news release)

FMI: www.hybridairvehicles.com


Advertisement

More News

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

ANN's Daily Aero-Linx (05.29.24)

Aero Linx: International Association of Professional Gyroplane Training (IAPGT) We are an Association of people who fly, build or regulate Gyroplanes, who have a dream of a single >[...]

ANN's Daily Aero-Term (05.29.24): NORDO (No Radio)

NORDO (No Radio) Aircraft that cannot or do not communicate by radio when radio communication is required are referred to as “NORDO.”>[...]

ANN's Daily Aero-Term (05.30.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

ANN's Daily Aero-Linx (05.30.24)

Aero Linx: Malibu M-Class Owners and Pilots Association (MMOPA) The Piper M-Class Owners & Pilots Association (PMOPA) is a not-for-profit organization dedicated to the interest>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC