FAA Publishes Contract Tower Closure Information | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sat, Mar 30, 2013

FAA Publishes Contract Tower Closure Information

Document Outlines What Will Happen With Personnel, Equipment

The FAA has published what it calls a "guidance" document in preparation for the closure of 149 contract air traffic control towers around the country. The agency announced the closures last week, citing the sequestration as making the cuts necessary.

The FAA says the document is designed to help answer some questions pilots and others may have on tower closures, and to provide an understanding of how to obtain additional information. The guide is divided into three sections:

  • Facilities and Equipment – What happens to the towers and equipment in them, plus procedures for an airport to create a non-Federal air traffic facility if desired.
  • Personnel – What happens to the contract air traffic controllers and FAA employees currently in the facilities
  • Operations – What the impact is on air traffic, air carrier, and airport operations.

The operator of an airport where the tower is closing may choose to operate as a non-towered airport. The airport operator may also choose to continue providing tower services as a non-Federal control tower. The decision made by the airport operator will most likely affect what happens with the existing tower structure and the equipment inside. The FAA says it is prepared to discuss the continued use of buildings and equipment with airports for those who desire to continue providing tower services.

As the FAA terminates its contracts for air traffic advisory services, the affected companies will determine the status of their employees. If the FAA has its own employees housed at these locations, then the necessary agreements will be made with airports to continue housing them or they will be relocated.

The document also offers detailed information about how to operate an uncontrolled airport, including procedures, radio frequencies, and safety information.

FMI: www.faa.gov/news/media/Contract_Tower_Closure_Guidance.pdf

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC