AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Jan 30, 2018

AD: Airbus Airplanes

AD NUMBER: 2018-02-12

PRODUCT: Certain Airbus Model A320-211, -212, and -231 airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-02-01, which applied to the products listed above.

AD 2016-02-01 required repetitive inspections to detect cracks of the pressurized floor fittings at a certain frame, and renewal of the zone protective finish or replacement of fittings with new fittings if necessary. AD 2016-02-01 also provided an optional modification that was terminating action for the repetitive inspections.

This new AD retains the requirements of AD 2016-02-01, and requires accomplishment of the modification that was optional in AD 2016-02-01.

This AD was prompted by the results of an additional fatigue analysis of cracking of the pressurized floor fittings and a determination that the optional modification should become a required action.  

DATES: This AD is effective March 2, 2018.

COST: The FAA estimates that this AD affects 13 airplanes of U.S. registry. The following costs are estimated for compliance:

  • Inspection: 11 work-hours × $85 per hour = $935 per aircraft per inspection cycle.
  • Modification: 85 work-hours × $85 per hour = $7,225 Parts = $5,320. Cost per aircraft: $12,545
FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC