Aero-TV: Bombardier At NBAA 2011 -- Learjet 85 Progress Report | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Oct 12, 2011

Aero-TV: Bombardier At NBAA 2011 -- Learjet 85 Progress Report

Newest Lear On Track For 2013 EIS

Production of the new Learjet 85 aircraft has officially begun as the program successfully exited the Aircraft Level Critical Design Review. Development and production teams in Wichita, Kansas; Montréal, Québec; Belfast, Northern Ireland; and Querétaro, Mexico, are actively engaged in the manufacturing validation phase.

Ralph Acs, Vice President and General Manager, Learjet, Bombardier Business Aircraft said the airplane is making solid progress. He said the manufacturing sites are ready, production has begun, and they have been successfully building parts and we are ensuring that all quality standards are met for the Learjet 85 aircraft’s entry into service in 2013.

The Querétaro site is operational with production tooling in place. To date, several test fuselages and key elements of the composite structure have been produced at the facility to validate the manufacturing and assembly processes. In addition, a full-length composite fuselage has been assembled, and production of the first flight test vehicle is underway.

The Learjet 85 aircraft program supply base has started the fabrication of parts, and is on track with approximately 40 per cent of dedicated supplier test rigs that are operational, running their respective systems prior to shipment to the final line.

As part of Bombardier’s technology readiness program, over 12,000 test pieces have been produced to date. The first FAA structural certification test project was successfully completed this summer.

FMI: www.bombardier.com, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

 


Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC