Aero-TV: Boeing's Biggest Jet -- Dreamlifter's Oshkosh Premiere | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Oct 28, 2008

Aero-TV: Boeing's Biggest Jet -- Dreamlifter's Oshkosh Premiere

This Monster Dwarfed Virtually Everything At Oshkosh!

If you visited on the "right days" at Oshkosh 2008, you either saw this monster... or were under its shadow. You could hardly miss Boeing's huge Dreamlifter... a plane so big, it swallows 787 fuselage sections whole. The Boeing Dreamlifter is a modified 747-400 passenger airplane that can haul more cargo by volume than any airplane in the world. It is the primary means of transporting major assemblies of the Boeing 787 Dreamliner from suppliers around the world to the 787 final assembly site in Everett, Wash. This reduces delivery times to as little as one day from as many as 30 days today.

Part of a four-plane fleet, the Dreamlifters  will be used to ferry 787 assemblies to WA. Granted type certification on June 2, 2007, from the FAA, the Dreamlifter has successfully passed all of the testing and safety requirements required by the FAA.

As part of the flight test program, FAA officials flew on board the Dreamlifter as it delivered major sections of the Dreamliner from partner sites around the world to the Boeing factory in Everett, WA for final assembly. Boeing reports the flights allowed the FAA to validate the overall delivery process and tools.

The Dreamlifter is not certified to carry passengers beyond essential crew. The Dreamlifter completed 437 flight-test hours and 639 hours of ground testing since its first flight on September 9, 2006.

With certification achieved, operation of the Dreamlifter fleet has been assumed by Evergreen International Airlines (EIA) of McMinnville, OR.

The Dreamlifter has a wing span of 211.5 feet, a length of 235 feet, 2 inches, and a height of 70 feet, 8 inches. It cruises Mach 0.82, can handle a cargo capacity of 65,000 cubic feet, and boasts a max gross takeoff weight of 803,000 lbs.

Enjoy The Immensity of the Boeing Dreamlifter With Aero-TV!

FMI: www.boeing.com, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC