Orbital ATK Achieves Milestone For ISS Cargo Delivery Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Oct 19, 2015

Orbital ATK Achieves Milestone For ISS Cargo Delivery Mission

Cygnus Service Module Shipped To Kennedy Space Center For December Launch

Orbital ATK has shipped the Cygnus spacecraft’s service module to NASA’s Kennedy Space Center for the next International Space Station (ISS) cargo mission, scheduled to launch on Thursday, December 3. Today’s OA-4 mission milestone marks a key step forward as Orbital ATK continues its cargo delivery service to the ISS for NASA under the Commercial Resupply Services (CRS) contract.

The Cygnus spacecraft will be assembled at Kennedy and launched aboard a United Launch Alliance Atlas V rocket. The mission serves as the first flight of the enhanced variant of the Cygnus spacecraft, capable of delivering more than 7,700 pounds of essential crew supplies, equipment and scientific experiments to astronauts on board the ISS.

The service module, which houses the spacecraft’s avionics, electrical, propulsion and communications systems, will integrate with an extended pressurized cargo module (PCM) already in place at the Kennedy Space Center. The PCM’s capability to deliver larger volumes of cargo to the station aboard the powerful Atlas V provides even greater support to NASA’s continued research and utilization of the International Space Station. The spacecraft will also use the latest in lightweight space-qualified power system technology with the addition of the company’s UltraFlex solar arrays. OA-4 marks the first mission to use the UltraFlex solar arrays which were produced by Orbital ATK’s Space Components Division.

“These are exciting times for the Cygnus team at Orbital ATK,” said Frank Culbertson, President of Orbital ATK’s Space Systems Group. “With OA-4 set to launch in December and at least three additional missions to the Space Station planned in 2016, we remain solidly on schedule to meet our CRS cargo requirements for NASA. Our team’s performance in meeting milestones on an accelerated timeline demonstrates the company’s flexibility and responsiveness to customer needs.”

Final assembly, cargo loading and fueling of the Cygnus spacecraft will take place at the Kennedy Space Center prior to its integration with the Atlas V rocket. Like most Orbital ATK spacecraft, Cygnus is designed to be compatible with multiple launch vehicles. This capability supports NASA’s requirements for additional cargo and also provides better schedule assurance for future missions.

While preparations continue for OA-4 later this year, three CRS missions are scheduled for 2016 to support NASA’s ISS cargo needs, leading off with a second Atlas V launched mission from Kennedy Space Center in the spring, followed by the return of operations to the Wallops Flight Facility in the first half of the year where the company will continue CRS missions on an upgraded Antares. The PCMs and Service Modules for the three 2016 Cygnus spacecraft missions are essentially complete and will be shipped to the respective launch sites a couple of months prior to their launch dates.

(Image of Cygnus spacecraft from file)

FMI: www.orbitalatk.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC