NASA Moves Shuttle Return To Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Jul 16, 2005

NASA Moves Shuttle Return To Flight

New Launch Date Later In Launch Window

Space Shuttle managers now say the launch of NASA's Space Shuttle Return to Flight mission, STS-114, will take place no earlier than late next week. At 1 p.m. EDT today, managers officially stopped the current launch countdown for Space Shuttle Discovery at Kennedy Space Center, Fla. Space Shuttle managers are optimistic that Discovery can lift off by July 31, the end of this launch window.

This weekend, managers and engineers will continue troubleshooting the problem with a liquid hydrogen low-level fuel sensor inside the External Tank. The sensor failed a routine prelaunch check during the launch countdown Wednesday, causing mission managers to postpone Discovery's first launch attempt. A dozen teams, with hundreds of engineers across the country, are working on the issue.

Once the problem is resolved and the countdown can be restarted, it will take about four days to launch. A countdown from this point will be a complete start over at T-43 (time minus 43) hours. Currently, there are no plans to roll Discovery back from the launch pad.

For now, Commander Eileen Collins and her six Discovery crew mates will stay at Kennedy Space Center while engineers work on the solution.

The next media update from Space Shuttle managers is planned for Monday. For any developments over the weekend, media can call for a recorded message at 321/867-2525.

FMI: www.nasa.gov/returntoflight

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC