Endeavour Crew Gets Down To Business | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Aug 09, 2007

Endeavour Crew Gets Down To Business

Heat Shield Inspection, Docking Preparations Slated For Thursday

With the exhilaration of launch still fresh on the minds of the astronauts onboard Endeavour, on Thursday the crew got down to business... inspecting the orbiter's heat shield, and readying the shuttle for Friday's scheduled rendezvous with the International Space Station.

NASA tells ANN pilot Charles Hobaugh, and mission specialists Tracy Caldwell and Rick Mastracchio are using the shuttle’s robotic arm and the Orbiter Boom Sensor System (OBSS) to take an extensive and detailed look at the orbiter’s thermal protection system. Mission specialists Dave Williams and Barbara Morgan will join Mastracchio for the latter part of the survey.

The crew of the space shuttle Endeavour was awakened for its first full day in orbit at 0837 EDT by the song "Where My Heart Will Take Me," performed by Russell Watson. The song -- Trekkers will recognize it as the theme to "Star Trek: Enterprise" -- was played for Mission Specialist Rick Mastracchio.

In preparation for Endeavour’s rendezvous and docking with the space station, crew members will also install a centerline camera, to assist Commander Scott Kelly in piloting the orbiter during its approach to the station docking port. Crew members also will check out rendezvous tools and extend the Orbiter Docking System ring.

Endeavour is scheduled to dock at 1353 EDT Friday.

FMI: www.nasa.gov/shuttle

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC