Osprey Completes Final Shipboard Developmental Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Dec 03, 2004

Osprey Completes Final Shipboard Developmental Testing

Operations, Maintenance Evaluated

The V-22 Integrated Test Team conducted Shipboard Suitability Phase IVc for ten days beginning on November 12. This was the fourth and final underway period for the ITT since the program's return to flight in May of 2002. Phase IVc's successful completion was an important step on the path toward the Osprey's operational evaluation early next year.

The primary objective of this phase was to complete interaction testing between a V-22 parked on the flight deck and another V-22 hovering in front of it. Additional test objectives included flight envelope expansion for all port side landing spots aboard the LHD, developing a night short takeoff envelope, and evaluating the latest flight control software version.

"The team was able to get a lot done during our time underway," said Bill Geyer, the ITT's lead shipboard suitability engineer. "The data we gathered will help us close the book on MV-22 shipboard developmental test. We've given the operational testers and, in turn, the fleet the tools for success at sea."

While the ITT was busy working on the Wasp's flight deck, a group of maintainers from VMX-22, the V-22 operational test and evaluation squadron based at MCAS New River, were in the hangar bay conducting maintenance demonstration testing. Tests included removing both engines, jacking the aircraft and cycling the landing gear, and removing prop-rotor hubs and blade assemblies. The VMX-22 team's findings will serve them well during the squadron's upcoming operational evaluation.

Geyer was quick to attribute the ITT's success to their hosts. "The Wasp was excellent," he said. "The bridge team went out of its way to get us the winds we needed, and the Air Department was always willing to go the extra mile to get the job done for us. Overall, it was the best experience I've ever had at sea while conducting tests."

(ANN salutes Ward Carroll, NAVAIR (V-22) Public Affairs Officer)


FMI: www.pma275.navair.navy.mil

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC