Thu, Sep 06, 2012
BF-2 Made 27 Successful Air Starts Last Month
The F-35 integrated test force announced the completion of a major prerequisite test for in-flight performance on the short take-off and vertical landing variant of the F-35 Lightning II Joint Strike Fighter September 4.
BF-2 completed the first air starts, which test the ability of the F-35's propulsion system to restart during flight. Verifying the restart capability of the propulsion system is part of the initial flight test program for the F-35 and a prerequisite for high angle-of-attack testing, scheduled to start next year.
"High alpha, or angle-of-attack tests, are important for us to fully evaluate the aircraft's handling characteristics and warfighting capability," said Marine Corps test pilot Lt. Col. Matthew Kelly. "Maximizing the performance of the airplane around the very slow edges of the flight envelope is probably some of the most challenging testing we will conduct. After we get through it, we'll know a lot more about how this aircraft will perform during combat within visual range."
Using multiple restart methods during the tests, BF-2 successfully completed a series of 27 air starts at various altitudes August 15. To execute air start testing, the F-35 Integrated Test Force (ITF) at Naval Air Station Patuxent River in Maryland ferried BF-2 and an F/A-18 chase aircraft from Air Test and Evaluation Squadron (VX) 23 to the F-35A testing facility at Edwards AFB.
"At Edwards, we have a unique testing range, which provides ideal and controlled conditions for completing air start testing. The Edwards range is comprised of 20,000 square miles of airspace, and has 65 linear miles of useable landing area on Rogers and Rosamond Dry Lakes, if required during engine out testing," said Lt. Col. George N. Schwartz, commander of the 461st Flight Test Squadron and government site director. "In addition, we've recently completed air start testing on the F-35A, so we're able to share some of our expertise with the Pax team as well."
The core of the F-35B's propulsion system is the F135 engine, capable of more than 40,000 pounds of thrust. "The F135 continues to power a successful flight test program," said Roy Hauck, Pratt & Whitney site lead at the F-35 Patuxent River ITF. "The aircraft and its integrated systems demonstrated intentional flameout and successful recovery scenarios during air start flight tests, and BF-2 and the team did a great job."
A team of approximately 60 ITF and VX-23 personnel provided engineering and maintenance requirements for the events. The detachment to Edwards from NAS Patuxent River overlapped with a busy summer flight testing schedule.
"In the past two months, we've sent detachments to Edwards and Lakehurst (NJ) and maintained a full-tempo test schedule here," said Navy Capt. Erik Etz, director of test for F-35 naval variants at NAS Patuxent River. "The team of military, government and industry personnel rallied to make all the events happen, and they can be proud of their accomplishments."
(F-35B images from file)
More News
Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]
Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]
"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]
(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]
“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]