Gulfstream Subtly But Significantly Renames The G250 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Jul 19, 2011

Gulfstream Subtly But Significantly Renames The G250

Selects G280 As A "More Amenable Number Sequence In Certain Cultures"

Gulfstream announced Monday that it has renamed the super midsized Gulfstream G250 aircraft. The business jet is now called the Gulfstream G280. As demand for Gulfstream business jets grows around the world, the move was prompted by the company’s sensitivity to the varied cultures of its international customer base.

“Since introducing the Gulfstream G250 in 2008 and presenting it to customers around the world, we determined that G280 is a more amenable number sequence in certain cultures,” said Larry Flynn, senior vice president, Marketing and Sales, Gulfstream. “We value our international customers highly, and this change reflects our commitment to understanding the diverse cultures of our global business environment.”

The renaming will not affect any other in-production Gulfstream aircraft.

Gulfstream introduced the G280 during the NBAA Conference and Exhibition in Orlando in 2008. The aircraft features an all-new, advanced transonic wing design that has been optimized for high-speed cruise and improved takeoff performance. At maximum takeoff weight, the G280 can depart from a 5,000-foot runway.

The G280 flight-test program is well under way. The three aircraft in the test program have exceeded 1,400 flight hours over 525 flights. At the same time, manufacturing of the first non-test aircraft, S/N 2004, is complete, with production acceptance testing under way at Israel Aerospace Industries near Tel Aviv. Production of the interior furnishings has begun at Gulfstream’s mid-cabin completions center in Dallas, where the G280 will be outfitted and painted.

FMI: www.gulfstream.com

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC