A380 Vertical Tail Plane Assembly Starts In Stade, Germany | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Dec 23, 2003

A380 Vertical Tail Plane Assembly Starts In Stade, Germany

The Airbus plant in Stade, northern Germany, has launched the assembly and equipping of the A380 vertical tail plane, or VTP. The A380 vertical tail plane has a surface120 square metres and integrates many components manufactured in different types of material.

The Airbus plant in Stade is a centre of excellence for carbon fibre reinforced plastic manufacturing and producing the VTP’s spars, ribs, rudder fittings and skin panels. Other parts for the VTP come from Airbus’ facilities in Puerto Real, Spain for the rudders, fin tips and dorsal fins, and from Varel, Germany which manufactures complex machined parts.

Key external suppliers include Japan’s Fuji Heavy Industries, which produces the leading and trailing edge sub-assemblies, as well as the carbon fibre reinforced plastic and metal fin tip, and Labinal, which designs and manufactures the tail’s main electrical cabling, or harnesses.

Several new assembly technologies were introduced to Stade’s production line in a bid to introduce even greater efficiency to the manufacturing process. Much of the A380 tail is produced from carbon fibre reinforced plastic and to ensure that the outer shape is perfectly smooth, Airbus applies a levelling material, or shim, between the inner parts and the skin panels. Airbus has now largely automated the shim preparation and application technique, slashing the application time of the material and ensuring maximum density.

Once assembled, the A380 VTP will be transported by truck to the River Elbe, where it will be loaded onto a barge and sent to Hamburg at the end of May 2004.

After painting in Hamburg, the tail’s lower rudder will be detached and sent in the Beluga transport aircraft to the A380 final assembly hall in Toulouse. The rest of the tail will follow in mid-June 2004 by sea and road.

FMI: www.airbus.com

Advertisement

More News

Bolen Gives Congress a Rare Thumbs-Up

Aviation Governance Secured...At Least For a While The National Business Aviation Association similarly applauded the passage of the FAA's recent reauthorization, contentedly recou>[...]

The SportPlane Resource Guide RETURNS!!!!

Emphasis On Growing The Future of Aviation Through Concentration on 'AFFORDABLE FLYERS' It's been a number of years since the Latest Edition of Jim Campbell's HUGE SportPlane Resou>[...]

Buying Sprees Continue: Textron eAviation Takes On Amazilia Aerospace

Amazilia Aerospace GmbH, Develops Digital Flight Control, Flight Guidance And Vehicle Management Systems Textron eAviation has acquired substantially all the assets of Amazilia Aer>[...]

Hawker 4000 Bizjets Gain Nav System, Data Link STC

Honeywell's Primus Brings New Tools and Niceties for Hawker Operators Hawker 4000 business jet operators have a new installation on the table, now that the FAA has granted an STC f>[...]

Echodyne Gets BVLOS Waiver for AiRanger Aircraft

Company Celebrates Niche-but-Important Advancement in Industry Standards Echodyne has announced full integration of its proprietary 'EchoFlight' radar into the e American Aerospace>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC