Boeing Awarded $99.5M Contract To Upgrade US Air Force B-1 Bomber Fleet | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Jul 11, 2011

Boeing Awarded $99.5M Contract To Upgrade US Air Force B-1 Bomber Fleet

Three Upgrades In Various Stages Planned For The Strategic Bombers

Boeing said Tuesday that it has been awarded a $99.5 million contract by the U.S. Air Force to integrate three major modifications on the B-1 Lancer bomber fleet. This contract is for the first lot of modification kits of a planned multi-lot production contract to upgrade the service’s B-1s.

The upgrades include delivery of kits with parts for the Vertical Situation Display Unit in the forward cockpit and for the Fully Integrated Data Link and the Central Integrated Test System in the aft cockpit. All three programs will be installed concurrently from late 2012 through 2019 in a single modification called the Integrated Battle Station.
 
“The Integrated Battle Station upgrades will provide B-1 bomber aircrews with a higher level of situational awareness and a faster secure digital communication link,” said Rick Greenwell, B-1 program director for Boeing. “This will enable the aircrews to perform at an even more effective level and will make the B-1 cockpit more reliable and supportable. Combining the separate upgrades into one production kit will enable us to deliver a more affordable upgraded aircraft to our customer in a timelier manner.”
 
The three upgrades are in various stages of final ground and flight tests in preparation for installation on the B-1 Lancer bomber fleet:

  • The Vertical Situation Display Unit upgrades the B-1’s forward cockpit by replacing two unsupportable, monochrome pilot and co-pilot displays with four multi-functional color displays, giving the pilots more situational awareness data in a user-friendly format.
  • The B-1 Fully Integrated Data Link will give the aft cockpit new digital avionics including a Link 16 data link, which adds line-of-sight capability to the B-1's existing beyond line-of-sight Joint Range Extension Applications Protocol (JREAP) data link, and integrates the JREAP data onto new, full-color displays with intuitive symbols and moving maps.
  • The Central Integrated Test System adds a new color display in the aft cockpit and replaces an obsolete computer that continuously monitors the aircraft’s performance. It also is used by ground support personnel to identify and troubleshoot B-1 system anomalies.
FMI: www.boeing.com

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC