Aura Launch Scrubbed... Again | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jul 15, 2004

Aura Launch Scrubbed... Again

Battery Glitch

The launch of NASA's Aura spacecraft atop a Boeing Delta II rocket was scrubbed Wednesday because of an issue with one of the two batteries on the second stage of the Delta II launch vehicle. At approximately three minutes before the scheduled liftoff time, as the batteries were being transferred to internal power, the battery current level dropped below prescribed limits, triggering a launch hold.

Engineers and mission managers are assessing the situation and deciding on a date for the next launch attempt. Two options are being considered. The first is to attempt a launch on Thursday morning, July 15, during a three-minute launch window that opens at 6:01:59 a.m. EDT (3:01:59 a.m. PDT). The second option under consideration is to stand down until Saturday, July 17, due to range conflicts at Vandenberg Air Force Base.

Weather is a concern for a launch attempt on Thursday morning. The current forecast calls for only a 60 percent probability of acceptable weather conditions. The primary concerns are for thick clouds and the possibility of triggered lightning in the launch area due to the remnants of daytime thunderstorm activity in Southern California. In addition, Tropical Storm Blas, off the coast of Baja California, could prevent a P3 aircraft from flying to its launch support position. The P3 relays telemetry from the launch vehicle back to the launch team at Vandenberg.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC