Aura Launch Scrubbed... Again | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Jul 15, 2004

Aura Launch Scrubbed... Again

Battery Glitch

The launch of NASA's Aura spacecraft atop a Boeing Delta II rocket was scrubbed Wednesday because of an issue with one of the two batteries on the second stage of the Delta II launch vehicle. At approximately three minutes before the scheduled liftoff time, as the batteries were being transferred to internal power, the battery current level dropped below prescribed limits, triggering a launch hold.

Engineers and mission managers are assessing the situation and deciding on a date for the next launch attempt. Two options are being considered. The first is to attempt a launch on Thursday morning, July 15, during a three-minute launch window that opens at 6:01:59 a.m. EDT (3:01:59 a.m. PDT). The second option under consideration is to stand down until Saturday, July 17, due to range conflicts at Vandenberg Air Force Base.

Weather is a concern for a launch attempt on Thursday morning. The current forecast calls for only a 60 percent probability of acceptable weather conditions. The primary concerns are for thick clouds and the possibility of triggered lightning in the launch area due to the remnants of daytime thunderstorm activity in Southern California. In addition, Tropical Storm Blas, off the coast of Baja California, could prevent a P3 aircraft from flying to its launch support position. The P3 relays telemetry from the launch vehicle back to the launch team at Vandenberg.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC