Brazilian AF To Upgrade Inspection Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sun, Apr 08, 2018

Brazilian AF To Upgrade Inspection Aircraft

New Panels To Be Installed In Four Hawker 800XP Jets

The Brazilian Air Force Flight Inspection Group (GEIV) will be upgrading its fleet of Hawker 800XP aircraft with Rockwell Collins’ Pro Line 21 avionics suite that will bring them into compliance with upcoming airspace mandate requirements. This marks the first Pro Line 21 retrofit to be installed on a Hawker 800XP in Latin America.

“Pro Line 21 provides enhanced situational awareness and delivers a whole new flight experience for pilots,” said Marcelo Vaz, managing director for Rockwell Collins in Brazil. “The upgrade will also bring the Brazilian Air Force improved reliability over legacy avionics with lower maintenance costs over the long-term.”

The Pro Line 21 retrofit replaces legacy Cathode Ray Tube (CRT) displays with four large, configurable 10 x 8-inch liquid crystal displays (LCDs) that are capable of displaying high-resolution electronic charts, graphical weather, enhanced navigation maps, enhanced vision and other mission-specific options.

The four Hawker 800XP aircraft being upgraded are used by the GEIV to inspect and calibrate the air navigation aid, approach and landing equipment, as well as the high precision air navigation procedures. This helps provide safe operation to all aircraft flying within Brazilian air space during all flight phases, especially during adverse meteorological conditions. Existing components on the aircraft used for its mission, such as the flight inspection deck and sensors, will be fully integrated to operate within the new Pro Line 21 system.

(Image provided with Rockwell Collins news release)

FMI: www.rockwellcollins.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC