Brazilian AF To Upgrade Inspection Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Apr 08, 2018

Brazilian AF To Upgrade Inspection Aircraft

New Panels To Be Installed In Four Hawker 800XP Jets

The Brazilian Air Force Flight Inspection Group (GEIV) will be upgrading its fleet of Hawker 800XP aircraft with Rockwell Collins’ Pro Line 21 avionics suite that will bring them into compliance with upcoming airspace mandate requirements. This marks the first Pro Line 21 retrofit to be installed on a Hawker 800XP in Latin America.

“Pro Line 21 provides enhanced situational awareness and delivers a whole new flight experience for pilots,” said Marcelo Vaz, managing director for Rockwell Collins in Brazil. “The upgrade will also bring the Brazilian Air Force improved reliability over legacy avionics with lower maintenance costs over the long-term.”

The Pro Line 21 retrofit replaces legacy Cathode Ray Tube (CRT) displays with four large, configurable 10 x 8-inch liquid crystal displays (LCDs) that are capable of displaying high-resolution electronic charts, graphical weather, enhanced navigation maps, enhanced vision and other mission-specific options.

The four Hawker 800XP aircraft being upgraded are used by the GEIV to inspect and calibrate the air navigation aid, approach and landing equipment, as well as the high precision air navigation procedures. This helps provide safe operation to all aircraft flying within Brazilian air space during all flight phases, especially during adverse meteorological conditions. Existing components on the aircraft used for its mission, such as the flight inspection deck and sensors, will be fully integrated to operate within the new Pro Line 21 system.

(Image provided with Rockwell Collins news release)

FMI: www.rockwellcollins.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC