AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jan 30, 2018

AD: Airbus Airplanes

AD NUMBER: 2018-02-12

PRODUCT: Certain Airbus Model A320-211, -212, and -231 airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-02-01, which applied to the products listed above.

AD 2016-02-01 required repetitive inspections to detect cracks of the pressurized floor fittings at a certain frame, and renewal of the zone protective finish or replacement of fittings with new fittings if necessary. AD 2016-02-01 also provided an optional modification that was terminating action for the repetitive inspections.

This new AD retains the requirements of AD 2016-02-01, and requires accomplishment of the modification that was optional in AD 2016-02-01.

This AD was prompted by the results of an additional fatigue analysis of cracking of the pressurized floor fittings and a determination that the optional modification should become a required action.  

DATES: This AD is effective March 2, 2018.

COST: The FAA estimates that this AD affects 13 airplanes of U.S. registry. The following costs are estimated for compliance:

  • Inspection: 11 work-hours × $85 per hour = $935 per aircraft per inspection cycle.
  • Modification: 85 work-hours × $85 per hour = $7,225 Parts = $5,320. Cost per aircraft: $12,545
FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC