First Flight: G650 Number Two | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Feb 28, 2010

First Flight: G650 Number Two

Two G650 Test Articles Airborne Simultaneously

Gulfstream Aerospace Corp. announced that a second ultra-large-cabin, ultra-long-range G650 has completed its first flight.  The second test article — known as T2 — took off from Savannah/Hilton Head International Airport (KSAV) at 12:50 p.m. on Thursday, Feb. 25, with senior experimental test pilots Gary Freeman and Scott Buethe in the cockpit.

The aircraft flew for 2 hours and 33 minutes, reaching an altitude of 37,000 feet (11,278 m) and a speed of Mach 0.80 before landing back in Savannah.  In a company first, both G650 flight-test aircraft — T2 and T1 — were airborne simultaneously and were tracked by dual telemetry facilities in real time.

“T2 performed extremely well during the initial tests of its integrated flight control system and handling,” said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. “We plan to make half a dozen flights to assess basic system functionality before proceeding to more intensive testing.”


First flight of the Gulfstream G650 T2 on Feb. 25, 2010

“The conditions were very gusty and blustery, yet T2, like T1, handled great,” said Freeman. “To control the aircraft precisely requires small, light control input from the pilot. It’s an easy jet to fly.”

The G650 flight-test and certification plan involves five aircraft and an estimated 1,800 hours of testing. Each aircraft is used for a specific series of tests, with T1 focused on performance and flight controls, T2 on systems and T3 on avionics. The two production aircraft in the test program — P1 and P2 — will be used to evaluate the interior systems and reduced vertical separation minimums (RVSMs), respectively.

T1, which spent approximately six hours in the air on Thursday, has completed 18 flights over more than 43 hours. The aircraft has reached a maximum speed of Mach 0.90 and a top altitude of 47,000 feet (14,326 m). Test pilots are progressively opening the flight envelope in conjunction with load testing of a ground-test airframe designated S6.

Gulfstream expects to receive concurrent G650 certification from the Federal Aviation Administration (FAA) and European Aviation Safety Agency (EASA) in 2011.


Joe Lombardo and Pres Henne at the roll out of the G650 T1 in 2009

Gulfstream announced the G650 program on March 13, 2008. On Sept. 29, 2009, the aircraft rolled out under its own power in front of a crowd of more than 7,000 people. It completed its first flight on Nov. 25, 2009, and remains on schedule for entry-into-service in 2012.

The G650 offers the longest range at the fastest speed in its class. Powered by best-in-class Rolls-Royce BR725 engines, the business jet is capable of traveling 7,000 nautical miles (12,964 km) at Mach 0.85 and has a maximum operating speed of Mach 0.925.

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC