Boeing Nears Completion On 737-900ER Design | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Jan 27, 2006

Boeing Nears Completion On 737-900ER Design

First Customer Delivery Expected In Early 2007

Boeing representatives tell Aero-News that company engineers have completed 90 percent of the design work on the newest variant of the stalwart 737, the 737-900ER.

The milestone means that nearly all of the engineering work necessary to build parts and tools for assembly has been completed and released to manufacturing.

"This is a critical milestone for the airplane as we make the transition from the development phase to the production phase," said Mike Delaney, 737 chief project engineer. "With most of the drawings complete, our suppliers and fabrication plants can begin manufacturing detailed parts."

What's more, the design milestone was reached spot-on the target date, meaning Boeing is on schedule to begin final assembly of the first 737-900ER this spring at the company's Renton, WA manufacturing facility.

As Aero-News reported last year, the -900ER was launched in July 2005 with a 30-airplane order from Indonesian carrier Lion Air. The Next Generation 737-900ER is designed to carry up to 215 passengers and fly up to 3,200 nautical miles (5,925 km).

Lion Air is expected to receive the first 737-900ER in the first half of 2007, after a five-month flight test program conducted using two test airplanes.

Ramp spotters will be able to identify the -900ER most readily by its additional pair of exit doors, as well as a two-position tail skid and blended winglets. A flat rear pressure bulkhead, aerodynamic and structural design changes that enhance low-speed and cruise performance, enhancements to the leading and trailing-edge flap systems, and strengthened wings are also part of the package.

All -900ERs will be powered by the CFM International CFM56-7B turbofan engines.

Boeing stressed the new derivative will have substantial economic advantages over the competing A321 -- including 9 percent lower operating costs per trip and 7 percent lower operating costs per seat.

FMI: www.boeing.com

Advertisement

More News

Bolen Gives Congress a Rare Thumbs-Up

Aviation Governance Secured...At Least For a While The National Business Aviation Association similarly applauded the passage of the FAA's recent reauthorization, contentedly recou>[...]

The SportPlane Resource Guide RETURNS!!!!

Emphasis On Growing The Future of Aviation Through Concentration on 'AFFORDABLE FLYERS' It's been a number of years since the Latest Edition of Jim Campbell's HUGE SportPlane Resou>[...]

Buying Sprees Continue: Textron eAviation Takes On Amazilia Aerospace

Amazilia Aerospace GmbH, Develops Digital Flight Control, Flight Guidance And Vehicle Management Systems Textron eAviation has acquired substantially all the assets of Amazilia Aer>[...]

Hawker 4000 Bizjets Gain Nav System, Data Link STC

Honeywell's Primus Brings New Tools and Niceties for Hawker Operators Hawker 4000 business jet operators have a new installation on the table, now that the FAA has granted an STC f>[...]

Echodyne Gets BVLOS Waiver for AiRanger Aircraft

Company Celebrates Niche-but-Important Advancement in Industry Standards Echodyne has announced full integration of its proprietary 'EchoFlight' radar into the e American Aerospace>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC