Australian Minister Applauds $901 M Wedgetail Sustainment Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Mar 19, 2014

Australian Minister Applauds $901 M Wedgetail Sustainment Contract

Multi-Year Agreement Covers Sustainment Of The Australian E-7A Fleet

Minister for Defense Senator David Johnston says a $901 million dollar (Australian) Wedgetail Airborne Early Warning and Control support contract unveiled today spells job security for hundreds of Australian workers. Senator Johnston said the support contract extension, signed by the Defense Material Organization, will be undertaken by Boeing Defense Australia and will ensure long-term value for money sustainment services for Defense.

The contract covers the sustainment of the Royal Australian Air Force’s E-7A Wedgetail fleet, including engineering and maintenance support, repairs, spare parts and aircrew and maintenance training for the Wedgetail fleet.
 
“The extension ensures efficient and cost-effective sustainment support, and is also testament to the effective build-up by Australian industry of E-7A Wedgetail operating, maintaining and engineering knowledge,” Senator Johnston said. “This is a significant outcome for the Wedgetail program and for the 290 industry staff employed directly on Wedgetail support in the Newcastle, Brisbane/Ipswich and Adelaide regions.
 
The E-7A Wedgetail represents an advanced and entirely new capability for the Australian Defense Force, providing a platform that gathers information from a wide variety of sources analyses it and distributes it to other aircraft and surface assets.
 
Of the $901 million, $433 million is being spent in Australia; $275m in Newcastle, $80m for Brisbane and Ipswich and $78m for Adelaide.
 
The Airborne Early Warning and Control capability operated by 2 Squadron at RAAF Williamtown consists of six E-7A Wedgetail aircraft, a full flight simulator, an operational mission simulator, a software development and test laboratory and maintenance facilities.

(Image provided by the Australian Ministry of Defense)

FMI: www.defense.gov.au

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC