AD: Diamond Aircraft Industries GmbH Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Sep 07, 2017

AD: Diamond Aircraft Industries GmbH Airplanes

AD NUMBER: 2017-18-10

PRODUCT: Certain Diamond Aircraft Industries GmbH Models DA 42, DA 42 M-NG, and DA 42 NG airplanes.

ACTION: Final Rule.

SUMMARY:  This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and correct an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as crack formation on the flap bell crank, which could cause the flap bell crank to fail.

DATES: This AD is effective October 11, 2017

COST: The FAA estimates  this AD will affect 190 products of U.S. registry. They also estimate that it will take about 4 work-hours per product to comply with the initial inspection requirement of this AD. The average labor rate is $85 per work-hour. Based on these figures, the estimated cost of the initial inspection requirement of this AD on U.S. operators to be $64,000, or $340 per product.

The FAA estimates it will take about 2 work-hours per product to comply with the repetitive inspection requirement of this AD. The average labor rate is $85 per work-hour. Based on these figures, the estimated cost of the repetitive inspection requirement of this AD on U.S. operators to be $32,300, or $170 per product.

In addition, the FAA estimates that any necessary replacement action will take about 1 work-hour and require parts costing $430, for a cost of $515 per product. They have no way of determining the number of products that may need these actions.

According to the manufacturer, some of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals. As the FAA does not control warranty coverage for affected individuals, the agency has included all costs in its cost estimate.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC