Discovery Undergoing On-Pad Repairs Prior To November 1 Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Fri, Oct 22, 2010

Discovery Undergoing On-Pad Repairs Prior To November 1 Launch

Preparations Under Way For Seal Replacement

Technicians at NASA's Kennedy Space Center in Florida pumped propellants out of tanks in the orbital maneuvering and reaction control systems Thursday in order to replace two seals for a fuel line, which had been leaking, for shuttle Discovery's orbital maneuvering system engines. Approximately 1,500 gallons of propellant will be offloaded.


NASA File Image

Crews will replace the primary and secondary seals at a flange located at the interface where two propellant lines meet in the shuttle's aft compartment. Work to replace the seals and reload propellants into the systems should be completed on October 25 and is expected to still support Discovery's targeted November 1 launch date.

At NASA's Johnson Space Center in Houston, the STS-133 crew conducted its final integrated entry simulation Thursday .

FMI: www.nasa.gov

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC