ISS Spacewalk To Repair Cooling System Moved To Saturday | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Fri, Aug 06, 2010

ISS Spacewalk To Repair Cooling System Moved To Saturday

Second EVA Scheduled For August 11 To Complete Repairs

The first of two spacewalks by NASA astronauts to replace a failed ammonia pump on the International Space Station has been moved to Saturday, August 7. A second spacewalk is planned for Wednesday, August 11, to complete the repairs.

Teams of flight controllers, engineers, and spacewalk experts have made significant progress in preparing for the first spacewalk, but need an additional day to get ready. The additional time allows for final procedures to be sent late Thursday to the station, giving the crew a full day to review the plans developed by Mission Control.

Managers also moved the second spacewalk to Wednesday to give the crew more time to rest and prepare.

Expedition 24 Flight Engineers Doug Wheelock and Tracy Caldwell Dyson are scheduled to perform the spacewalks, which are both scheduled to begin at 6:55 a.m. Saturday's spacewalk will be the fourth for Wheelock and the first for Caldwell Dyson.


(L-R) Tracy Caldwell Dyson, Doug Wheelock

Engineers and flight controllers continue to review data on the July 31 pump failure, which caused the loss of one of two cooling loops aboard the station. This failure resulted in a power down and required adjustments to maintain as much redundancy as possible for the station systems. The systems are stable, and the station's six crew members are not in any danger.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC