NASA Extends Space Shuttle External Tank Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Dec 27, 2007

NASA Extends Space Shuttle External Tank Contract

NASA has signed a $465.7 million contract modification with Lockheed Martin, New Orleans, for space shuttle external tanks. The modification aligns and extends all activities associated with the production contract for the tanks to the launch schedule for the space shuttle's retirement date of 2010.

The modification supports the agency's priorities of safely flying the space shuttle, completing construction of the International Space Station and NASA's long-term plan to return astronauts to the moon and beyond.

The cost plus award fee/incentive fee contract will conclude Sept. 30, 2010, and brings the total value of the contract, awarded October 2000, to $2.94 billion. The contract calls for the delivery of 17 external tanks to NASA.

Work under the contract will be performed at NASA's Michoud Assembly Facility in New Orleans, NASA's Marshall Space Flight Center in Huntsville, Ala. and NASA's Kennedy Space Center, Fla.

Lockheed Martin builds, assembles and tests the space shuttle external tanks for NASA at the Michoud facility. The external tank holds the liquid hydrogen fuel and liquid oxygen for the shuttle's three main engines. It is the largest single component of the space shuttle and the only part of the shuttle that is not reused. At 154 feet tall, the gigantic rust-colored tank is taller than a 15-story building and as wide as a silo, with a diameter of about 27.5 feet. During launch, the tank acts as the structural backbone for the shuttle orbiter and the solid rocket boosters attached to it.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC