NASA’s Orion Spacecraft Nears Completion, Ready For Fueling | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sat, Sep 13, 2014

NASA’s Orion Spacecraft Nears Completion, Ready For Fueling

First Test Flight Scheduled In Just Three Months

NASA is making steady progress on its Orion spacecraft, completing several milestones this week at NASA's Kennedy Space Center in Florida in preparation for the capsule's first trip to space in December.

Engineers finished building the Orion crew module, attached it and the already-completed service module to the adapter that will join Orion to its rocket. The assembly was transported Thursday to the Payload Hazardous Servicing Facility at Kennedy Space Center in Florida, where it will be fueled ahead of its December flight test.

"Nothing about building the first of a brand new space transportation system is easy," said Mark Geyer, Orion Program manager. "But the crew module is undoubtedly the most complex component that will fly in December. The pressure vessel, the heat shield, parachute system, avionics -- piecing all of that together into a working spacecraft is an accomplishment. Seeing it fly in three months is going to be amazing."

Finishing the Orion crew module marks the completion of all major components of the spacecraft. The other two major elements -- the inert service module and the launch abort system -- were completed in January and December, respectively. The crew module was attached to the service module in June to allow for testing before the finishing touches were put on the crew module.

The adapter that will connect Orion to the United Launch Alliance (ULA) Delta IV Heavy rocket was built by NASA's Marshall Space Flight Center in Huntsville, Alabama. It is being tested for use on the agency's Space Launch System rocket for future deep space missions.

NASA, Orion's prime contractor Lockheed Martin, and ULA managers oversaw the move of the spacecraft Thursday from the Neil Armstrong Operations and Checkout Building to the Payload Hazardous Servicing Facility at Kennedy, where it will be fueled with ammonia and hyper-propellants for its flight test. Once fueling is complete, the launch abort system will be attached. At that point, the spacecraft will be complete and ready to stack on the Delta IV Heavy.

Orion is being built to send humans farther than ever before, including to an asteroid and Mars. Although the spacecraft will be uncrewed during its December flight test, the crew module will be used to transport astronauts safely to and from space on future missions. Orion will provide living quarters for up to 21 days, while longer missions will incorporate an additional habitat to provide extra space. Many of Orion's critical safety systems will be evaluated during December's mission, designated Exploration Flight Test-1, when the spacecraft travels about 3,600 miles into space.

(Image provided by NASA)

FMI: www.nasa.gov/orion

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC