SpaceX Expects Full Falcon 9 Integration By Year's End | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Dec 26, 2008

SpaceX Expects Full Falcon 9 Integration By Year's End

Company Recently Awarded $1.6 Billion Contract From NASA

Space Exploration Technologies founder Elon Musk told ANN this week he expects his company's first Falcon 9 heavy-lift booster to be fully integrated by New Year's Eve.

"[Sunday] we lifted the first stage off the shipping truck and lowered it onto the integration assemblies," Musk writes. "With all of the F9 hardware currently at or on its way to the Cape, we are on track for a fully integrated launch vehicle by year's end.

"Barring any unforeseen delays, the second stage and fairing are expected to arrive at the Cape by December 28th and will be mated on December 31st, just in time for the New Year.

"The erector is also on track towards operational status in early January, with the base assembly to be aligned and tacked by December 26th and welding to be complete early in the New Year," Musk concluded. "Hold down assemblies are expected to arrive shortly after the New Year and with our ground control system at SLC-40 currently operational, it's just a matter of days before F9 is vertical at the Cape."

As ANN reported, on Wednesday NASA awarded SpaceX a $1.6 billion contract to provide 12 cargo resupply flights to the International Space Station, beginning within the next two years. Those flights will utilize the Falcon 9 booster, with the company's Dragon cargo delivery capsule riding atop the rocket... a set-up SpaceX says could lead to manned spaceflights, as well.

Before any of that occurs, however, SpaceX needs a perfect first launch for the Falcon 9... something the company was not able to accomplish with the smaller Falcon 1 rocket, until that booster's fourth launch this September.

FMI: www.spacex.com

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC