SpaceX Expects Full Falcon 9 Integration By Year's End | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Fri, Dec 26, 2008

SpaceX Expects Full Falcon 9 Integration By Year's End

Company Recently Awarded $1.6 Billion Contract From NASA

Space Exploration Technologies founder Elon Musk told ANN this week he expects his company's first Falcon 9 heavy-lift booster to be fully integrated by New Year's Eve.

"[Sunday] we lifted the first stage off the shipping truck and lowered it onto the integration assemblies," Musk writes. "With all of the F9 hardware currently at or on its way to the Cape, we are on track for a fully integrated launch vehicle by year's end.

"Barring any unforeseen delays, the second stage and fairing are expected to arrive at the Cape by December 28th and will be mated on December 31st, just in time for the New Year.

"The erector is also on track towards operational status in early January, with the base assembly to be aligned and tacked by December 26th and welding to be complete early in the New Year," Musk concluded. "Hold down assemblies are expected to arrive shortly after the New Year and with our ground control system at SLC-40 currently operational, it's just a matter of days before F9 is vertical at the Cape."

As ANN reported, on Wednesday NASA awarded SpaceX a $1.6 billion contract to provide 12 cargo resupply flights to the International Space Station, beginning within the next two years. Those flights will utilize the Falcon 9 booster, with the company's Dragon cargo delivery capsule riding atop the rocket... a set-up SpaceX says could lead to manned spaceflights, as well.

Before any of that occurs, however, SpaceX needs a perfect first launch for the Falcon 9... something the company was not able to accomplish with the smaller Falcon 1 rocket, until that booster's fourth launch this September.

FMI: www.spacex.com

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC