NGC, US Navy Successfully Conduct E-2D Advanced Hawkeye Aerial Refueling CDR | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Mon, Jul 06, 2015

NGC, US Navy Successfully Conduct E-2D Advanced Hawkeye Aerial Refueling CDR

Capability Will Extend E-2D Advanced Hawkeye Flight Endurance

The U.S. Navy and Northrop Grumman have successfully conducted the critical design review (CDR) for the E-2D Advanced Hawkeye Aerial Refueling (AR) system.

"The AR team continues to put outstanding effort into bringing this much needed capability to the E-2D Advanced Hawkeye," said Capt. John Lemmon, program manager, E-2/C-2 Airborne Tactical Data System Program Office (PMA-231). "Aerial Refueling will enable the E-2D Advanced Hawkeye to provide longer on-station times at greater ranges."

Under a $226.7 million engineering, manufacturing and development (EMD) contract awarded in 2013, Northrop Grumman is designing, developing, manufacturing and testing several sub-system upgrades necessary to accommodate an aerial refueling capability.

Approval of this critical milestone demonstrates design maturity and acknowledgement that the program is ready to transition to the build/test phase. CDR also moves the program closer to installing this capability on new production aircraft. The E-2D aircraft already in service will be retrofitted with the aerial refueling capability.

"Achieving this critical milestone moves the program one step closer to fielding this much needed capability to the Warfighter," said Jane Bishop, vice president, E-2/C-2 programs, Northrop Grumman.

Installation of the developmental Aerial Refueling subsystem and flight test instrumentation onto the E2D test aircraft will commence in the second quarter of FY2016 at Northrop Grumman's St. Augustine manufacturing facility. Flight testing for the AR-equipped E-2D test aircraft is planned for FY2017, with Initial Operational Capability (IOC) expected in FY2020.

(Image provided by Northrop Grumman)

FMI: www.northropgrumman.com, www.navy.mil

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC