NTSB To Conduct Additional Test On Dreamliner Batteries | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, May 09, 2013

NTSB To Conduct Additional Test On Dreamliner Batteries

Airplanes May Be Returning To Service, But The Investigation Is Still Ongoing

The NTSB has reportedly extended a contract with Chesapeake Defense Services for additional Computed Tomography (CT) scans of batteries similar to those removed Boeing Dreamliners as it continues its investigation into why a battery caught fire aboard one of JAL's 787s in January.

The Board hopes to have the scans completed by May 16.

According to a "sources sought notice" posted by the NTSB May 3, "The NTSB is planning to conduct teardown examinations as soon as possible of several aircraft batteries similar to one involved in an aircraft incident. This urgent requirement is in support of accident investigation DCA13IA037 that occurred in Boston, MA. To facilitate those examinations, CT scans of these batteries and their subcomponents are required to non-destructively determine as much information as possible about those components.

"In addition, batteries and battery cells of the same type which have been subjected to known test conditions will also be scanned. These scans will be conducted both before and after the test conditions are applied. Since these batteries are of the lithium ion type and have substantial shipping restrictions (including a requirement for ground shipping only using specially qualified hazardous materials shippers which would cause a delay of several days to accommodate), these scans need to be conducted at a location close to Washington, D.C. to allow the NTSB to transport the battery to the contractor and thereby avoid shipping and other logistical complications. They must also be completed within the shortest timeframe possible to provide the fastest possible receipt of this information to avoid potential future accidents involving this type of aircraft battery.

"Since the FAA has recently approved a plan intended to result in the Boeing 787 being approved for a return to service, the information from these tests (and the CT scans required to support these tests) is needed as soon as possible. A scan report that documents items such as the x-ray source power used, x-ray focal spot size, detector used, integration time, number of views, image pixel size, slice thickness, total length scanned, number of slices, etc. is due no later than 10 days after the end of the scanning activity. The NTSB has a requirement for CT scanning services to begin on 5/6/2013. Therefore, this requirement is urgent."

Eight Dreamliner-type battery cells will be scanned.

The Puget Sound Business Journal reports that, according to the NTSB,  the original $49,000 contract account had only $1,000 left after the initial scans. The new contract represents an extension of the deal previously reached with Chesapeake Defense Services.

The document indicates that testing is continuing on the battery removed from the JAL Dreamliner which caught fire while sitting at a gate at Boston Logan International Airport, as well as other batteries.

(Images provided by the NTSB)

FMI: www.ntsb.gov

Advertisement

More News

Bolen Gives Congress a Rare Thumbs-Up

Aviation Governance Secured...At Least For a While The National Business Aviation Association similarly applauded the passage of the FAA's recent reauthorization, contentedly recou>[...]

The SportPlane Resource Guide RETURNS!!!!

Emphasis On Growing The Future of Aviation Through Concentration on 'AFFORDABLE FLYERS' It's been a number of years since the Latest Edition of Jim Campbell's HUGE SportPlane Resou>[...]

Buying Sprees Continue: Textron eAviation Takes On Amazilia Aerospace

Amazilia Aerospace GmbH, Develops Digital Flight Control, Flight Guidance And Vehicle Management Systems Textron eAviation has acquired substantially all the assets of Amazilia Aer>[...]

Hawker 4000 Bizjets Gain Nav System, Data Link STC

Honeywell's Primus Brings New Tools and Niceties for Hawker Operators Hawker 4000 business jet operators have a new installation on the table, now that the FAA has granted an STC f>[...]

Echodyne Gets BVLOS Waiver for AiRanger Aircraft

Company Celebrates Niche-but-Important Advancement in Industry Standards Echodyne has announced full integration of its proprietary 'EchoFlight' radar into the e American Aerospace>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC