Boeing Awarded $2.6 Billion For Fifth KC-46A Tanker Production Lot | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Oct 02, 2019

Boeing Awarded $2.6 Billion For Fifth KC-46A Tanker Production Lot

Includes 15 Aircraft, Parts, Extra Engines And Other Items

The U.S. Air Force has awarded Boeing a $2.6 billion contract for 15 KC-46A tanker aircraft, spares, support equipment, spare engines and wing air refueling pod kits. With this fifth production lot, Boeing now is on contract for 67 KC-46 tankers.

Boeing received its first two production lots, for 7 and 12 aircraft, in August 2016. The third lot, for 15 aircraft, was awarded in January 2017; the fourth lot for 18 aircraft in September 2018.

“We’re honored to build the Air Force’s next-generation tanker and appreciate the importance of this program for our nation,” said Jamie Burgess, Boeing KC-46A tanker vice president and program manager. “This has been a milestone year for KC-46 and a big reason for that is our great partnership with the Air Force. We expect to accomplish great things together in the years to come.”

Boeing plans to build 179 of the 767-based refueling aircraft for the Air Force to replace its legacy tanker fleet. The company delivered the first tankers to the Air Force in January 2019.

Boeing received its initial contract in 2011 to design and develop the Air Force’s newest tanker aircraft. The KC-46A is a multirole tanker that can refuel allied and coalition military aircraft compatible with international aerial refueling procedures and can carry passengers, cargo and patients.

Boeing is assembling KC-46 aircraft at its Everett, Wash., facility and recently started production of the first KC-46 for Japan.

(Image provided with Boeing news release)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC