Airbus Safran Launchers Confirms Maturity Of The Ariane 6 Launcher | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Jun 18, 2016

Airbus Safran Launchers Confirms Maturity Of The Ariane 6 Launcher

First Design Phase Finalized

Airbus Safran Launchers has just finalized the first design phase for Ariane 6, successfully confirming the maturity of the future European launcher, for which the maiden flight is scheduled for 2020.

This first design review, called "Maturity Gate 5", enables Airbus Safran Launchers to confirm performance, schedule and operating costs.

This successful design review is a major milestone in the validation process of the Ariane 6 programme under contract from the European Space Agency (ESA). It enables Airbus Safran Launchers to validate all of the Ariane 6 technical, industrial and programming characteristics. Its conclusions were presented to ESA on 10th June.

Airbus Safran Launchers and all its European industrial partners are now continuing with launcher development at the planned rate.

"This success confirms all our undertakings to the European Space Agency and its Member States, and means that we can make a firm budget commitment to the development and production of Ariane 6, for which the maiden flight is confirmed for 2020," said Alain Charmeau, CEO of Airbus Safran Launchers.

This review was validated under the responsibility of Airbus Safran Launchers and involved representatives from ESA, CNES, DLR and ASI as well as independent experts.

This "Maturity Gate 5" review began on 28th April 2016, less than 9 months after the development contract was signed with ESA on 12th August 2015. It follows finalisation of the design of the future European launcher and the deployment of its industrial organisation with all the industrial partners, in the form of an "extended enterprise".

Ariane 6 will be a flexible, modular and competitive launcher, offering two versions, Ariane 62 and Ariane 64, in order to guarantee continued European access to space.

(Image provided with Airbus Safran news release)

FMI: www.airbusafran-launchers.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC