Boeing Completes 787 Firm Configuration | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sat, Sep 24, 2005

Boeing Completes 787 Firm Configuration

Structure, Propulsion, Systems Now Set

Members of the 787 Dreamliner team gathered Friday to celebrate the achievement of firm configuration for the all-new Boeing airplane. This milestone marks the close of the joint development phase of the program and the full-scale start of detailed design.

"Firm configuration means the airplane's structural, propulsion and systems architectures are firm. They are not changing," said Mike Bair, vice president and general manager of the 787 program. "This allows us and our partners to proceed with detailed design -- down to the smallest parts and final composite ply layouts -- with great confidence.

"At the end of detailed design, we will know what each inch of the airplane looks like and how it interacts with every other inch of the airplane."

Commenting further on reaching firm configuration, Bair noted: "The team has done a fantastic job to get us through this important milestone. There are still great challenges ahead as we move toward the beginning of production, first flight, certification and our first deliveries, but we are confident in out abilities to meet our commitments to our customers."

FMI: www.boeing.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC