Aero-News Network: The aviation and aerospace world's daily/real-time news and information service
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Hide/Show Archive Navigation.

All News

June 17, 2022

AD: Cameron Balloons Ltd.

AD 2022-13-03 Requires The Removal Of Any Installed P/N Cb2990 (Alugas) Fuel Cylinder

The FAA is adopting a new airworthiness directive (AD) for certain Cameron Balloons Ltd. (Cameron) fuel cylinders installed on hot air balloons. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI identifies the unsafe condition as cracks in the weld between the cylinder valve plate and the upper dished end of Cameron part number (P/N) CB2990 (Alugas) fuel cylinders, which could allow uncontrolled fuel leakage of liquid propane. This AD requires the removal of any installed P/N CB2990 (Alugas) fuel cylinder fro

Read More




Advertisement

Advertisement

Podcasts

AeroTwitter

© 2007 - 2024 Web Development & Design by Pauli Systems, LC