Aero-News Network: The aviation and aerospace world's daily/real-time news and information service
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Hide/Show Archive Navigation.

All News

June 07, 2022

Supply-Chain Delays Impact 737 MAX Program

Boeing Concedes Production Rate to Ensure Quality 

Trouble in the form of supply-chain delays has beset Boeing’s beleaguered, 737 MAX program. A source familiar with Boeing production schedules states the 737 MAX assembly line at the company’s Renton, WA plant sat idle for a period of roughly ten-days in May as airplanes were held in position pending delivery of parts missing because of supply chain issues. According to the source, work on production line aircraft did not stop entirely, but continued to the extent possible with extant parts. 

Read More

Pilot Dismissed After Ill-Timed Nap

Non Contestare La Mia Etica Del Lavoro!

The captain of an ITA A-330 has been fired by the Italian state-carrier for allegedly falling asleep at the controls of his aircraft during a flight from New York to Rome. Marseille ATC was unable to contact the Airbus, designated flight AZ609, for an unknown period of time, however, the pilots on board the ITA jet eventually did report before continuing on to Rome without incident. The captain subsequently stated that the radio connection was interrupted due to a technical issue, but ITA refuted the claim after an examination of the aircraft. Flight data showed that flight AZ609 did not lose altitude or deviate from course during the NORDO interval. 

Read More




Advertisement

Advertisement

Podcasts

AeroTwitter

© 2007 - 2024 Web Development & Design by Pauli Systems, LC