Urgent CASA AD: Dornier | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.01.25 (Holiday)

Airborne-NextGen-08.26.25

AirborneUnlimited-08.27.25

Airborne-AffordableFlyers-08.28.25

AirborneUnlimited-08.22.25

Fri, Dec 16, 2005

Urgent CASA AD: Dornier

Applicability: Do 228-100, -101, -200, -201, -202 and -212 aeroplanes.
Requirement: 1. Inspect the overhead panel 5VE and 6VE for chafing of the wiring and correct installation of the ty-rap holders in accordance with RUAG Services GmbH All Operator Telefax AOT-228-24-028 dated 9 November 2005.
2. If, as a result of the Requirement 1 inspection, discrepancies are found with the wiring or installation of the ty-rap holders, carry out any necessary modifications in accordance with the AOT.

Note 1: The following Time Limits/Maintenance Checks Manual(TLMCM) and
Aircraft Maintenance Manual (AMM) Temporary Revisions (T/R) also refer:
TLMCM 05-05
AMM 39-2, 39-3, 39-4, 39-5

Note 2: LBA AD D-2005-438 (EASA Approval 2005-6430) refers.

Compliance: For Requirement 1 - Within twenty eight days after the effective date of this Directive and thereafter at twelve month intervals.
For Requirement 2 - Before further flight after the Requirement 1 inspection.

This Airworthiness Directive becomes effective on 19 December 2005.

Background: The German Luftfahrt-Bundesamt has advised that, due to vibration and a loss of adhesive on ty-rap wiring holders above the overhead panels 5VE and 6VE wiring may chafe against switches in the panels. This Directive requires the wiring to be inspected for chafing and ty-rap holder for correct installation and, if necessary, the correction of any discrepancies.

FMI: www.casa.gov.au

Advertisement

More News

YFQ-42A Collaborative Combat Aircraft Starts Flight Testing

Newest USAF Drone Begins Process in Earnest The YFQ-42A Collaborative Combat Aircraft has begun its flight testing in coordination with the U.S. Air Force, taking a vital step towa>[...]

Aero-News: Quote of the Day (09.02.25)

“What a great moment for the U.S. Air Force and for GA-ASI. It’s been our collaboration that enabled us to build and fly the YFQ-42A in just over a year. It’s an >[...]

Delta Settles Fuel Dump Lawsuit in a $78M Handshake

Airline Pilots Jettisoned 15,000 Pounds of Fuel Over Populated Areas Five years after one of its Boeing 777s dumped 15,000 pounds of jet fuel onto neighborhoods, Delta Air Lines ha>[...]

Watchdog Warns of Another Understaffed FAA Program: Meteorology

GAO Report Says that Only 69 Aviation Meteorologists Work Alongside ATC A federal watchdog says the FAA is running the nation’s air traffic system with fewer weather experts >[...]

Airborne 08.27.25: Air Race Tkt Discounts, Europe AvGas, Deportation Flights?

Also: 500-Aircraft Deal With China, Florida ANG's F-35, FAA Denies Petition, UC Central Arkansas Aviation Academy The Reno Air Racing Association (RARA) is offering its apologies t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC