Urgent CASA AD: Dornier | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Fri, Dec 16, 2005

Urgent CASA AD: Dornier

Applicability: Do 228-100, -101, -200, -201, -202 and -212 aeroplanes.
Requirement: 1. Inspect the overhead panel 5VE and 6VE for chafing of the wiring and correct installation of the ty-rap holders in accordance with RUAG Services GmbH All Operator Telefax AOT-228-24-028 dated 9 November 2005.
2. If, as a result of the Requirement 1 inspection, discrepancies are found with the wiring or installation of the ty-rap holders, carry out any necessary modifications in accordance with the AOT.

Note 1: The following Time Limits/Maintenance Checks Manual(TLMCM) and
Aircraft Maintenance Manual (AMM) Temporary Revisions (T/R) also refer:
TLMCM 05-05
AMM 39-2, 39-3, 39-4, 39-5

Note 2: LBA AD D-2005-438 (EASA Approval 2005-6430) refers.

Compliance: For Requirement 1 - Within twenty eight days after the effective date of this Directive and thereafter at twelve month intervals.
For Requirement 2 - Before further flight after the Requirement 1 inspection.

This Airworthiness Directive becomes effective on 19 December 2005.

Background: The German Luftfahrt-Bundesamt has advised that, due to vibration and a loss of adhesive on ty-rap wiring holders above the overhead panels 5VE and 6VE wiring may chafe against switches in the panels. This Directive requires the wiring to be inspected for chafing and ty-rap holder for correct installation and, if necessary, the correction of any discrepancies.

FMI: www.casa.gov.au

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC