STS-125: Three Out Of Five Spacewalks Successfully Completed So Far | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sun, May 17, 2009

STS-125: Three Out Of Five Spacewalks Successfully Completed So Far

"Batting 1000" To This Point

STS-125 mission specialists John Grunsfeld and Drew Feustel finished the mission’s third spacewalk Saturday at 4:11 p.m. EDT. The spacewalk lasted 6 hours, 36 minutes. During the endeavor outside the shuttle, Feustel and Grunsfeld removed the Corrective Optics Space Telescope Axial Replacement and installed in its place the new Cosmic Origins Spectrograph. They also completed the Advanced Camera for Surveys electronic card replacement work. The spacewalkers were ahead of schedule and were able to complete part 2 of the ACS repair, installing a new electronics box and cable.

Space shuttle Atlantis’ 11-day mission is the final shuttle flight to NASA’s Hubble Space Telescope. The seven-member crew will enhance the observatory and ensure cutting-edge science. The mission puts in place advanced technology that improves the telescope’s discovery power by 10 to 70 times. The five scheduled spacewalks will install new instruments and thermal blankets, repair two existing instruments, refurbish subsystems and replace gyroscopes, batteries and a unit that stores and transmits science data to Earth. The result will be six working, complementary science instruments with new capabilities, and an extended operational lifespan through at least 2014.

Saturday, the spacewalkers focused on the installation of the telescope’s new Cosmic Origins Spectrograph and completed the Advanced Camera for Surveys repair work. Engineers from the Space Telescope Operations Control Center at Goddard Spaceflight Center in Maryland powered up both components and reported good aliveness tests. More tests will be conducted during the astronauts sleep period.

On Sunday, starting at 9:16 a.m., astronauts Mike Good and Mike Massimino will repair the Space Telescope Imaging Spectrograph and install the New Outer Blanket Layer during the fourth STS-125 spacewalk.

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (04.28.25)

“While legendary World War II aircraft such as the Corsair and P-51 Mustang still were widely flown at the start of the Korean War in 1950, a new age of jets rapidly came to >[...]

ANN's Daily Aero-Term (04.28.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (04.28.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

Airborne-Flight Training 04.24.25: GA Refocused, Seminole/Epic, WestJet v TFWP

Also: Cal Poly Aviation Club, $$un Country, Arkansas Aviation Academy, Teamsters Local 2118 In response to two recent general aviation accidents that made national headlines, more >[...]

Aero-News: Quote of the Day (04.29.25)

“The FAA is tasked with ensuring our skies are safe, and they do a great job at it, but there is something about the system that is holding up the medical process. Obviously,>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC