Parachute Failure Mars NASA's Second LDSD Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Jun 10, 2015

Parachute Failure Mars NASA's Second LDSD Test

Chute Did Not Fully Deploy, Data Being Analyzed

NASA’s Low-Density Supersonic Decelerator (LDSD) project completed its second flight test when the saucer-shaped craft splashed down safely Monday in the Pacific Ocean off the coast of the Hawaiian island of Kauai Monday.

NASA said in a news release that two experimental decelerator technologies – a supersonic inflatable aerodynamic decelerator and a supersonic parachute – were tested. The supersonic inflatable aerodynamic decelerator deployed and inflated. The supersonic parachute also deployed; however, it did not perform as expected. Data were obtained on the performance of both innovative braking technologies, and the teams are beginning to study the data.

NASAspaceflight.com reports that the test was still considered a success. The LDSD was carried to 120,000 feet by a large balloon and released. The four rocket motors designed to spin the disc to give it gyroscopic stability fired as expected, as did the main rocket motor which carried the disk to 180,000 feet. The  Supersonic Inflatable Aerodynamic Decelerator (SAID) deployed nominally, slowing the disk form Mach 3.8 to Mach 2.5.

But as with the last test, the parachute failed to fully deploy. While that was not so much of a concern for the first test, it was one of the major test parameters following a redesign of the parachute system.

NASA is still analyzing the data to determine its next steps in the program.

(Images provided by NASA)

FMI: www.nasa.gov/mission_pages/tdm/ldsd/index.html


Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC