Teams Continue To Work Toward Nov. 30 Discovery Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Nov 15, 2010

Teams Continue To Work Toward Nov. 30 Discovery Launch

GUPC Alignment Tweaked, Fuel Tank Foam Repairs Proceeding

Space Shuttle Discovery continues to wait at launch complex 39A at the Kennedy Space Center in Cape Canaveral, FL, as technicians work to prepare her for her final mission into space.


NASA File Photo

Over the weekend, additional measurements were taken to ensure the best possible alignment of the newly installed ground umbilical carrier plate, or GUCP, on space shuttle Discovery's external fuel tank. Teams installed the flight seal Friday night and will meet today to evaluate data. Technicians expect to begin installing the quick disconnects today (Monday).

Engineers also are continuing work to repair cracks in Discovery's external tank intertank section. During foam removal and inspection of adjacent stringers to the one with two 9-inch cracks, technicians identified a crack about 3-inches long on the left-hand adjacent stringer. This was not an unexpected result since the load was most likely transferred to the adjacent stringer when both sides of the original stringer cracked during tanking operations for Discovery's scrubbed launch attempt on Nov. 5. Teams will build and use existing structural math models to understand the loading at the interface. Stringers are aluminum support strips on the outside of the external tank that form the section between the inside liquid oxygen tank and the liquid hydrogen tanks.

Discovery's launch was delayed when the leaking GUPC was discovered. The cracks in the foam insulation on the main fuel tank were found during the GUPC inspection. The shuttle is now targeted for launch on a mission to ISS on November 30. It will be Discovery's final space flight.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC