AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Mar 16, 2018

AD: Airbus Airplanes

AD NUMBER: 2018-06-03

PRODUCT: Certain Airbus Model A310-203, -204, -221, -222, -304, -322, -324, and -325 airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2009-18-16, which applied to the aircraft listed above. AD 2009-18-16 required an inspection for cracking of certain fastener holes on certain frames, and related investigative and corrective actions if necessary; and modification of certain fastener holes.

This new AD reduces the compliance times. This AD was prompted by the identification of a structural modification that falls within the scope of the work related to the extension of the service life of the affected airplanes and widespread fatigue damage evaluations.

DATES: This AD is effective April 19, 2018.

COST: The FAA estimates that this AD affects 8 airplanes of U.S. registry. It will take about 41 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Required parts will cost about $20,180 per product. Based on these figures, the estimated cost of this AD on U.S. operators to be $189,320, or $23,665 per product.

Although no definitive data has been received that will enable the FAA to provide cost estimates for the on-condition actions (i.e., additional inspection and modification for certain airplanes) specified in this AD, it has been determined that the total repair costs could be up to $10,000 per product. The FAA has no way of determining the number of aircraft that might need these repairs.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC