Boeing B-1 Upgraded With Fully Integrated Data Link Completes 1st Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Fri, Aug 14, 2009

Boeing B-1 Upgraded With Fully Integrated Data Link Completes 1st Flight

Contract Award Expected In 2010

Boeing said Thursday that a B-1 bomber upgraded with the Fully Integrated Data Link (FIDL)successfully completed the first flight late in July. This upgrade includes new processors, color displays and communications architecture, enhancing B-1 crews' situational awareness and communications capability. The U.S. Air Force 419th Test Squadron conducted the flight from Edwards Air Force Base, CA.

The objective of the FIDL development program is to enhance the B-1 bomber by integrating beyond line-of-sight and line-of-sight data links. The data links reduce crew workload by dynamically re-tasking missions, eliminating the need for steps such as manual entry of weapons data for targeting.

In addition to the cockpit upgrades, the modification also improves and more tightly integrates the aft crew stations by replacing displays and associated hardware that were installed during aircraft production in the early 1980s. Additional upgrades include new open-architecture processors, mass-storage capability and an Ethernet network to integrate the aircraft's systems.

Boeing personnel at Edwards Air Force Base have been modifying the test aircraft over the past year. B-1 program employees at Edwards, at the Boeing facility in Long Beach and in other locations developed and integrated the new system's hardware and software.

 

File Photo

"Our team worked closely with the Air Force and many other programs throughout Boeing as we performed independent reviews of product designs and gained valuable insight from employees performing similar development tasks," said Mahesh Reddy, Boeing B-1 program manager. "This cross-company teamwork led to our successful first flight, which brings us one step closer to completing this major B-1 upgrade for our customer."

Flight testing will continue through 2010. The Air Force is expected to award a contract in November 2010 for the production of FIDL installation kits for the service's entire B-1 fleet.

FMI: www.boeing.com, www.af.mil

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC