Another Day, Another Quality Issue on 787 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Jun 12, 2023

Another Day, Another Quality Issue on 787

Supplier's Part Out of Spec, Exceeding Tolerances in Horizontal Stabilizer Assembly

The Dreamliner will see delays once again after Boeing discovered another manufacturing SNAFU inside the 787's construction.

The company said that it was inspecting all 787s in inventory in search of "a nonconforming condition related to a fitting on the horizontal stabilizer. The inspections and required rework will affect the timing of near-term 787 deliveries."

The issue is just the latest in a long line of quality woes encountered in the 787's troubled manufacturing history. The novel, liberal use of next-gen materials and lightweight composites have taken Boeing on a bit of a learning journey throughout the Dreamliner's production run, and recent issues continue that burgeoning tradition. 

The affected part is a fitting that joins the horizontal stabilizer, sized incorrectly by a supplier. The pieces, when installed, were found to have created a gap greater than allowed in the blueprints, which are limited to a few thousandths of an inch on paper. Repairs will end up taking some time, along with going over Dreamliners in inventory to ensure nothing similar occurred with them, too. The horizontal stab issue is separate from a recent problem with the vertical one, uncovered in April. In that case, the issue was blamed on a 'nonstandard' procedure, and affected a handful of fittings that attached the tail to the fuselage. That fix alone has added months to Dreamliner delivery schedules, making customers wonder just how long they'll have to wait to get the next batch. 

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC