Another Day, Another Quality Issue on 787 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Mon, Jun 12, 2023

Another Day, Another Quality Issue on 787

Supplier's Part Out of Spec, Exceeding Tolerances in Horizontal Stabilizer Assembly

The Dreamliner will see delays once again after Boeing discovered another manufacturing SNAFU inside the 787's construction.

The company said that it was inspecting all 787s in inventory in search of "a nonconforming condition related to a fitting on the horizontal stabilizer. The inspections and required rework will affect the timing of near-term 787 deliveries."

The issue is just the latest in a long line of quality woes encountered in the 787's troubled manufacturing history. The novel, liberal use of next-gen materials and lightweight composites have taken Boeing on a bit of a learning journey throughout the Dreamliner's production run, and recent issues continue that burgeoning tradition. 

The affected part is a fitting that joins the horizontal stabilizer, sized incorrectly by a supplier. The pieces, when installed, were found to have created a gap greater than allowed in the blueprints, which are limited to a few thousandths of an inch on paper. Repairs will end up taking some time, along with going over Dreamliners in inventory to ensure nothing similar occurred with them, too. The horizontal stab issue is separate from a recent problem with the vertical one, uncovered in April. In that case, the issue was blamed on a 'nonstandard' procedure, and affected a handful of fittings that attached the tail to the fuselage. That fix alone has added months to Dreamliner delivery schedules, making customers wonder just how long they'll have to wait to get the next batch. 

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC