Report: JLENS Airship Not Meeting Expectations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Oct 26, 2015

Report: JLENS Airship Not Meeting Expectations

But Program Has Powerful Friends In Washington

An investigation conducted by a news organization has found that the Army's JLENS program has failed to meet expectations after 17 years and an investment of nearly $3 billion.

The Baltimore Sun reports that, according to an investigation by Tribune Media, the 240-foot-long white tethered blimp has failed to effectively track targets and distinguish threats from friendly aircraft. Tribune Media reports that in a review of reports generated by the U.S. GAO and the Pentagon Operational Test and Evaluation Office, the JLENS' performance was rated as "poor" in 2012, citing issues if four "critical performance areas."

The Baltimore Sun reports that the JLENS, which is designed to track low-flying aircraft, did not detect Douglas Hughes, who flew a gyrocopter through the area monitored by the JLENS and eventually landed on the West Lawn of the U.S. Capitol.

He got through, according to the Army, because software issues kept a second JLENS aircraft of the ground, and data from the aircraft has "not been integrated into the NORAD air defense network," according to Maj. Beth R. Smith.

According to the report, the Army tried to end the program in 2010, but prime contractor Raytheon and other supporters managed to salvage funding for the technology. The system was defended by Marine Corps Gen. James E. "Hoss" Cartwright, who was at the time the vice chairman of the Joint Chiefs of Staff.

Cartwright later joined the Raytheon board, and the paper reports that according to the SEC, he was paid more than $282,000 in cash and stock.

The Army says that JLENS is currently in a "testing and system checkout phase."

(Image from file)

FMI: www.army.mil

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC