Lycoming Completes SB 552 Crankshaft Replacement Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Apr 02, 2003

Lycoming Completes SB 552 Crankshaft Replacement Program

Lycoming has successfully completed the installation of replacement crankshafts in the 797 TIO-540 engines that were returned for repair under Service Bulletin 552 and has shipped these engines so they can be returned to service. Of the 601 engines tested under Service Bulletin 553, 417 have passed and most of the remaining 184 have been repaired and returned to service.

More than 1,100 crankshafts have been forged using a new, more vigorous manufacturing process and have passed newly developed tests.

"We made a promise to our customers that we would resolve this replacement and repair issue by the early part of the second quarter and we have delivered on that promise," said Richard Millman, executive in charge of Lycoming.

In the fall of 2002, Lycoming committed to replacing crankshafts in engines covered by Service Bulletins 552 and 553. Owners and operators of aircraft powered by Lycoming TIO-540 engines of more than 300 or more horsepower were required to comply with the service bulletins and to replace their crankshafts. The cost of the crankshaft replacement, as well as various related costs, were paid by Lycoming as part of its Customer Care Program. In addition to repairing and replacing internal parts, the Program includes alternate transportation or fixed costs (including interest on loans, insurance {ground insurance} and hangar rental); remote hangar fees; and an additional 12 month engine warranty from the date the engine is returned to service. More than $35 million was earmarked to cover the costs of the repair and customer care program.

"The repair process included the thorough disassembly, inspection, crankshaft replacement, assembly and full testing consistent with our commitment to flight safety," said Mike Wolf, president of Lycoming. "I am happy to report that we have met our goals ahead of schedule and sent these engines back to their owners."

FMI: www.lycoming.textron.com

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC