First Production Contract Awarded For CH-53K King Stallion | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Sep 08, 2017

First Production Contract Awarded For CH-53K King Stallion

Funds Two CH-53K Helicopters And Support

The Naval Air Systems Command (NAVAIR) awarded a sole source, Fixed Price Incentive Firm, Firm Fixed Price, Cost-Plus-Fixed-Fee contract  to Sikorsky Aircraft Corp., a Lockheed Martin company, for the Lot 1 Low Rate Initial Production of the CH-53K King Stallion, valued at $303,974,406.

The contract action provides the funds for two CH-53K helicopters along with engineering and integrated logistics support, spares, and peculiar support equipment (i.e., unique tools and support equipment specific to the CH-53K).

“I am proud of what the team has negotiated to bring this remarkable and unrivaled helicopter one step closer to the fleet,” said Col Hank Vanderborght, program manager for NAVAIR’s Heavy Lift Helicopters program, PMA-261.

The contract award follows the spring Milestone C decision, approving the Navy's request for the CH-53K program to enter into the Production and Deployment phase.

“This contract will benefit our Marine Corps’ ‘heavy lifters’ for decades to come,” said Vanderborght. “Future Marines, not even born yet, will be flying this helicopter well into the future.”

Initial deliveries from Lot 1 are expected to begin in 2020. This contract does not include engines; engines will be procured as Government Furnished Equipment via a separate contract with General Electric.

The CH-53K is a new-build helicopter that evolved from the design of its predecessor, the CH-53E Super Stallion. Improvements with the King Stallion include increased operational capability, interoperability, reliability, maintainability, survivability and decreased cost of ownership. The U.S. Marine Corps intends to stand-up eight active duty squadrons, one training squadron and one reserve squadron to support operational requirements. The DOD’s program of record remains at 200 aircraft, a requirement validated by the Joint Requirements Oversight Council (JROC).

Currently, there are four Engineering Development and Manufacturing Model aircraft in test and one Ground Test Vehicle, logging more than 500 cumulative flight hours. Initial operational capability remains on pace for 2019 and is defined as having four aircraft, with combat-ready crews logistically prepared to deploy.

PMA-261 manages the cradle-to-grave procurement, development, support, fielding and disposal of the of the entire H-53 helicopter portfolio.

(Image provided with NAVAIR news release)

FMI: www.navair.navy.mil

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC