USAF Program Works To Reduce Risk On Next Air Force One | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, Jul 19, 2016

USAF Program Works To Reduce Risk On Next Air Force One

Designed To Control Costs In Procurement, Development Of Modified 747-8 Aircraft

The Air Force awarded a contract modification to Boeing July 15 to continue risk reduction activities for the Presidential Aircraft Recapitalization program, which will field the next Air Force One.

Future modifications will be made to this contract to purchase the commercial 747-8 aircraft, as well as to design, modify and test those aircraft to meet the presidential mission.

These efforts are another step in a deliberate process to control program risk and life cycle costs. This contract modification provides for risk reduction activities needed to address PAR sustainment requirements and costs and are additional to those initially awarded on Jan. 29. These activities will most notably focus on the system specification, environmental control system, aircraft interior, electrical and power system, and sustainment/maintenance approaches. They will aid in further defining detailed requirements and design trade-offs required to support informed decisions that will lead to a lower risk engineering and manufacturing development program and lower life cycle costs.

“The information from these studies is essential for us to make informed decisions on the design and modifications to the 747-8 aircraft, which will have long-term impacts to sustainment costs of the next Air Force One,” said Col. Amy McCain, the PAR program manager. “All of the different modifications to the aircraft need to work together seamlessly. As we understand more about how to meet the detailed requirements, we can make deliberate choices to lower the cost and risks to the program.”

The Air Force will award the majority of the program on a separate contract action after the results of the risk reduction activities are known.

The PAR program will replace the VC-25A in the 2024 time frame through a highly tailored acquisition program. Parts obsolescence and diminishing sources for replacement parts are driving increased costs and increasing out of service times for heavy maintenance to maintain Federal Aviation Administration airworthiness standards. That time has already grown to well over a year per heavy maintenance cycle, significantly limiting availability for presidential support.

The PAR program requirements are documented in the capability development document, which was approved in November 2014. The acquisition strategy to replace Air Force One was approved by the undersecretary of defense for acquisition, technology and logistics on Sept. 4, 2015.

(Source: USAF news release. Image from file)

FMI: www.af.mil

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC