AD: Diamond Aircraft Industries GmbH Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Thu, Sep 07, 2017

AD: Diamond Aircraft Industries GmbH Airplanes

AD NUMBER: 2017-18-10

PRODUCT: Certain Diamond Aircraft Industries GmbH Models DA 42, DA 42 M-NG, and DA 42 NG airplanes.

ACTION: Final Rule.

SUMMARY:  This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and correct an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as crack formation on the flap bell crank, which could cause the flap bell crank to fail.

DATES: This AD is effective October 11, 2017

COST: The FAA estimates  this AD will affect 190 products of U.S. registry. They also estimate that it will take about 4 work-hours per product to comply with the initial inspection requirement of this AD. The average labor rate is $85 per work-hour. Based on these figures, the estimated cost of the initial inspection requirement of this AD on U.S. operators to be $64,000, or $340 per product.

The FAA estimates it will take about 2 work-hours per product to comply with the repetitive inspection requirement of this AD. The average labor rate is $85 per work-hour. Based on these figures, the estimated cost of the repetitive inspection requirement of this AD on U.S. operators to be $32,300, or $170 per product.

In addition, the FAA estimates that any necessary replacement action will take about 1 work-hour and require parts costing $430, for a cost of $515 per product. They have no way of determining the number of products that may need these actions.

According to the manufacturer, some of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals. As the FAA does not control warranty coverage for affected individuals, the agency has included all costs in its cost estimate.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC