Fifth And Final A350 XWB Test Aircraft Enters Final Assembly Line | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Nov 06, 2013

Fifth And Final A350 XWB Test Aircraft Enters Final Assembly Line

First Flight Planned In Spring 2014

Assembly of MSN5, the fifth and final member of the A350 XWB flight test fleet is now underway with the fuselage joining process. This follows the recent arrival of the three fuselage sections at the A350 XWB final assembly line in Toulouse, France.

MSN5 is the second of the A350 flight test aircraft that will feature a passenger cabin. This aircraft will fly for the first time in spring 2014 and will be used essentially to perform cabin related flight tests. It will also participate in the Early Long Flights where the “passengers” are Airbus employees. This allows the cabin and related systems to be submitted to near realistic operations in order to ensure a mature cabin at entry into service. In addition, MSN5 will carry out Route Proving flights to demonstrate to the certification authorities that the aircraft performs perfectly in airport operations.
 
To date the two A350 XWB test aircraft, MSN1 and MSN3 have clocked up over 500 flight test hours in more than 100 test flights. The A350 XWB has already won more than 760 firm orders from 39 customers worldwide. First delivery will be to Qatar Airways in the second half of 2014.

(Image provided by Airbus)

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC